Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CC0135

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CC0135","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS PAMPANGA RIVER BASIN - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER MEYSULAO SECTION CALUMPIT, BULACAN","Flood Control and Drainage","Completed",14612967.55,0,100,"Bulacan 1st DEO","Region III","E.R. DELA CRUZ CONSTRUCTION & SUPPLY (32158)","2016-12-15","2017-05-28",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"301400000"]
SHA-256
e607331a91c4e446912fd68cf8a0cecfa9849472f4f5cf7ca14a967f193dc35a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.