Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CD0111

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CD0111","VALENZUELA-OBANDO-MEYCAUAYAN FLOOD CONTROL PROJECT-CONST.OF RIVERWALL ALONG MEYCAUAYAN RIVER-LAWA-NLEX (STA.4+897.60 - STA.4+999.60,RIGHT SIDE)","Flood Control and Drainage","Completed",21655145.12,0,100,"Bulacan 2nd DEO","Region III","AZUL BUILDERS (21870)","2016-05-30","2016-11-16",2016,"Regular Infra - GAA 2016 MFO-2",14.73881,120.9753,"301412000","301400000"]
SHA-256
a3f45e86d9b56810a732fe235329f42c882cc8eb7d91ba19bce47260de9a7171

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.