Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CD0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CD0121","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO RIVER, MARILAO,BULACAN(STA.1+908 - STA.2+087,LEFT SIDE)","Flood Control and Drainage","Completed",32967226.97,0,100,"Bulacan 2nd DEO","Region III","HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)","2016-05-30","2016-11-15",2016,"Regular Infra - GAA 2016 MFO-2",14.75412,120.95083,"301411000","301400000"]
SHA-256
983464c94fc484015b9dfc0353a73b43e6d90f8d911a69cce1605c153b9dd5e8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.