Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CE0299

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CE0299","CONSTRUCTION OF A 4STY24CL SCHOOL BUILDING, CONSTANCIO PADILLA NATIONAL HS, SAN JOSE CITY, NUEVA ECIJA 2ND LD","Buildings and Facilities","Completed",36221000,0,100,"Nueva Ecija 1st DEO","Region III","ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169)","2017-02-13","2017-11-09",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"304900000"]
SHA-256
c3988f71b8cfd7b2ff1fc5119749670db25487431de9287cc06d4a482da2e7a7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.