Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CF0174

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CF0174","CONSTRUCTION OF 2 4STY12CL SCHOOL BUILDING, SAN JOSEF NATIONAL HIGH SCHOOL, CABANATUAN CITY, NUEVA ECIJA 3RD LD - CONSTRUCTION OF CLASSROOM","Buildings and Facilities","Completed",44440319,0,100,"Nueva Ecija 2nd DEO","Region III","ADROIT EJD CONSTRUCTION CORP. (FORMERLY: ADROIT CONSTRUCTION) (11169) / IJK MAE CONSTRUCTION INC. (35272)","2017-05-24","2017-12-04",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"304900000"]
SHA-256
d40ab19f53412583b08c484fe53b8936a6930a9e364bb5146b90f698989f01b4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.