Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CG0123

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CG0123","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE & DRAINAGE SYSTEM-REHABILITATION OF CHECKGATE @ PALIMPE CENTRO, MASANTOL, PAMPANGA","Flood Control and Drainage","Completed",7486433,0,100,"Pampanga 1st DEO","Region III","THREE-IN-ONE CONSTRUCTION & TRADING (14695)","2016-08-04","2016-10-17",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"305400000"]
SHA-256
40476ff57554fcce0e15744a2b35a42d7e17d2fe420272855229e59a1f0ef09c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.