Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CN0109

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CN0109","CONSTRUCTION OF 2-STOREY 4-CL SCHOOL BUILDING, DINADIAWAN ELEMENTARY SCHOOL, DIPACULAO, AURORA","Buildings and Facilities","Completed",6079085.68,0,100,"Aurora DEO","Region III","JOHN DEE B. BUSTAMANTE CONSTRUCTION (30458)","2016-10-24","2017-03-22",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"307700000"]
SHA-256
4f83b32425a9d5fae6a7bc82c37b84fa5d4fb4b7da01abb32a982b3a90a2fb74

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.