Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16EB0116

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16EB0116","CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (PALUAN, MAMBURAO, ABRA DE ILOG AND LUBANG), PALUAN, MAMBURAO, ABRA DE ILOG AND LUBANG, OCC. MINDORO","GAA 2016 MFO-3","Completed",3218481.97,0,100,"Mindoro Occidental DEO","MIMAROPA Region","CHUTOR CONSTRUCTION AND CONSTRUCTION SUPPLIES (FORMERLY: CHUTOR CONSTRUCTION) (30340)","2016-12-01","2017-08-25",2016,"Regular Infra - GAA 2016 MFO-3",null,null,null,null]
SHA-256
20e4e553fe5e804ec884c80e0e7f6b3c41e1a1df8438fd43db279d3a9637b564

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.