Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16EH0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16EH0015","CONSTRUCTION OF TULAY FLOOD CONTROL ALONG TABLAS CIRCUMFERENTIAL ROAD  K0000 + 000 - K0000 + 065.00 (BOTHSIDES), K0000 + 075 -  K0000 + 108.50 (BOTHSIDES), BRGY. TULAY, ODIONGAN, ROMBLON","GAA 2016 MFO-2","Completed",26288013.95,0,100,"Romblon DEO","MIMAROPA Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2016-03-07","2016-09-17",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"1705900000"]
SHA-256
95b216ec54e2d5cffc1966726bf2d755999ba9e10e5e11e1f4ff0890936840d6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.