Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16F00106

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16F00106","BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT)-LIBON FLOOD CONTROL, LIBON, ALBAY 3RD LD","Flood Control and Drainage","Completed",59902137.09,0,100,"Region V","Region V","ELKANKONSTRAK DEVELOPMENT CORPORATION (26220)","2017-03-16","2017-12-18",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,null]
SHA-256
5f578d2fcc9775d06c4f429d0bd72f5cda522489e050d1d9f31b3bd16279119b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.