Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16F00143

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16F00143","RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (SAN MIGUEL SECTION),SAN MIGUEL, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT","Flood Control and Drainage","On-Going",80892842.13,0,94.1,"Region V","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2018-01-25",null,2016,"Outside Infra - GAA 2016 NDRRMF",13.40194,123.375,"501723000","501700000"]
SHA-256
acf0cba448dc1b9689a80a145fbdd18c7a6bd2840401b9260fd6d6cb7d68c5e5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.