Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16FB0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16FB0022","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- REHABILITATION OF BINANUAN FLOOD CONTROL SYSTEM, BRGY. 2, (LEFT SIDE) STA. 0+000 - STA. 0+630, CAMALIG, ALBAY","Flood Control and Drainage","Completed",21034727.17,0,100,"Albay 2nd DEO","Region V","AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION) (17869)","2016-02-02","2016-06-03",2016,"Regular Infra - GAA 2016 MFO-2",13.18386,123.65511,"500502000","500500000"]
SHA-256
0c3d1b87a3261a361288beb412ec2c1bec55e36d4686fd0c7721abeb2851fdec

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.