Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16FC0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16FC0046","CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM ( CLUSTER 2 ) ,DAET,BASUD,MERCEDES,VINZONS,TALISAY,SAN","Water Provision and Storage","Completed",1590788.09,0,100,"Camarines Norte DEO","Region V","GOLDEN CONSTRUCTION AND SUPPLY (35001)","2016-09-21","2016-10-31",2016,"Regular Infra - GAA 2016 MFO-3",null,null,null,"501600000"]
SHA-256
0f1d60d2a9b6cd32bccee008434efd76ac8266e1ae009f7b30ac190d6a310b87

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.