Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16FH0094

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16FH0094","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF GENITLIGAN PROTECTION WALL, GENITLIGAN, BARAS, CATANDUANES","Flood Control and Drainage","Completed",11760000,0,100,"Catanduanes DEO","Region V","NFH CONSTRUCTION & SUPPLY (16055)","2017-03-16","2017-10-10",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"502000000"]
SHA-256
cca31a755d3a949a10424214cfce085fcbfafe0f1b534af1d8d56dd8c04e6185

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.