Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16FK0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16FK0024","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF BACON RIVER FLOOD CONTROL, BACON DISTRICT, SORSOGON CITY","GAA 2016 MFO-2","Completed",71593949.02,0,100,"Region V","Region V","3DIAMONDS CONSTRUCTION CORPORATION (35457) / WCS CONSTRUCTION, INC. (6516)","2016-03-27","2016-11-09",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,null]
SHA-256
4bb08ebf34b5047cb5e067e59741d6cb226c79e84578c71e9bb31d8adc68aae4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.