Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16HB0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16HB0045","CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (CLUSTER III)","Water Provision and Storage","Completed",648576,0,100,"Bohol 3rd DEO","Region VII","FUENTABUILT CONSTRUCTION CORP. (36098)","2016-07-21","2016-08-20",2016,"Regular Infra - GAA 2016 MFO-3",null,null,null,"701200000"]
SHA-256
4b42cd407102eaeb9db09d3dd23c63fd2490e788d3d0b3773e91df0daf424529

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.