Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16HB0055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16HB0055","CONSTRUCTION OF TECH-VOC WORKSHOP BUILDING/LABORATORIES FOR SENIOR HIGH SCHOOL, ALICIA TECHNICAL-VOCATIONAL HIGH SCHOOL, ALICIA, BOHOL","Buildings and Facilities","Completed",2631675.56,0,100,"Bohol 3rd DEO","Region VII","FUENTABUILT CONSTRUCTION CORP. (36098)","2016-09-08","2017-01-03",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"701200000"]
SHA-256
3f7b175a9cb344aba0a031f4315d3400a191b31c4f69d2832c7f9e24c6fbfbb7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.