Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16HH0098

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16HH0098","CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE STRUCTURES, BRGY. CALAMBA, CEBU CITY","Flood Control and Drainage","Completed",2330500,0,100,"Cebu City DEO","Region VII","V.O. CHUPUICO CONSTRUCTION (17585)","2017-02-23","2017-05-08",2017,"Regular Infra - GAA 2017 MFO-2",null,null,"730600000","702200000"]
SHA-256
d99138dea1947b20fbdfdbf7b29117f676f78d18a5425273adcd5f90b3564f9d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.