Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16IH0093

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16IH0093","CONSTRUCTION OF TECHNICAL AND VOCATIONAL LABORATORY BUILDING BOBON SCHOOL FOR PHILIPPINE CARFTSMEN, BOBON, NORTHERN SAMAR","Buildings and Facilities","Completed",2194118.74,0,100,"Northern Samar 1st DEO","Region VIII","UBAS CONSTRUCTION (18875)","2017-12-27","2018-04-21",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"804800000"]
SHA-256
7bb08967d17a6ea98ef8aed6f08e6c287d3b50fde7989afbec8cceefb9e2a03c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.