Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16LE0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16LE0042","CONSTRUCTION OF 2 STOREY 6 CL SCHOOL BUILDING AT EDNA GUILLERMO MNHS,JOSE ABAD SANTOS(TRINIDAD),DAVA","Buildings and Facilities","Completed",8344756.49,0,100,"Davao Occidental DEO","Region XI","FORTSTONE CONSTRUCTION ENTERPRISES (31668)","2016-07-07","2016-12-03",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"1108600000"]
SHA-256
d470437cbb42d5e18aef44ef0ce81dc8bcbe05f983b6ec355cd9e96828e28f28

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.