Project 16M00009
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16M00009","ROAD UPGRADING (GRAVEL TO CONCRETE) OF ISULAN JUNTION-NINOY AQUINO ROAD, K1809+225-K1810+420; K1812+178.70-K1814+340 BAGUMBAYAN, SULTAN KUDARAT","Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP","Completed",138964137.04,0,100,"Region XII","Region XII","GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)","2016-04-26","2018-02-22",2016,"Regular Infra - Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP",6.47258,124.3182,"1206512000","1206500000"]
SHA-256
98bf1002e68a0237b93b6f46ea4c0e71eb4555513a33805d64b00ab6c1e20e80Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.