Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16MB0092

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16MB0092","CONSTRUCTION OF TECHVOC FACILITIES/WORKSHOP BUILDINGS AT PAO-PAO NATIONAL HIGH SCHOOL, BRGY. SINAWAL, GENERAL SANTOS CITY","Buildings and Facilities","Completed",2419669.25,0,100,"South Cotabato 1st DEO","Region XII","FFJJ CONSTRUCTION (16712)","2016-11-17","2018-04-30",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"1206300000"]
SHA-256
857439230bbcf9c49f550f2679dad53585158aaa5beccc070a48639379d0723c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.