Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16MB0137

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16MB0137","CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS 1 STOREY 2 CL AT JOSE D. ESCOBILLO NATIONAL HIGH SCHOOL, TUPI, SOUTH COTABATO","Buildings and Facilities","Completed",1952720.7,0,100,"South Cotabato 1st DEO","Region XII","FFJJ CONSTRUCTION (16712)","2016-09-29","2018-04-30",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"1206300000"]
SHA-256
8ef1859b48cc69648f16f048c0110c388b250fe01e29e79bc844acc7c2559589

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.