Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16MG0159

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16MG0159","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS-MINDANAO RIVER BASIN:REHABILITATION/IMPROVEMENT OF BRGY. KIBID FLOOD CONTROL AND BANK PROTECTION ALONG BANGA RIVER, NORALA, SOUTH COTABATO","Flood Control and Drainage","Completed",19154925.96,0,100,"South Cotabato 2nd DEO","Region XII","BETTER WORK CONSTRUCTION (24432)","2016-10-04","2017-03-22",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"1206300000"]
SHA-256
dbcf88db0189ab6f0cae6fd820af923866f0e75aa7d1d4571b17cb98b84388fe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.