Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16NI0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16NI0010","PACKAGE 3 - CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), SURIGAO DEL SUR","Water Provision and Storage","Completed",3146413,0,100,"Surigao del Sur 2nd DEO","Region XIII","MAG CORPORATION (36929)","2016-08-25","2016-12-06",2016,"Regular Infra - GAA 2016 MFO-3",null,null,null,"1606800000"]
SHA-256
3f37a75305c841660ab9c5599397b682b1d65369aedb4cafe5f1e79e502798ad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.