Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16OD0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16OD0026","CONSTRUCTION OF FLOOD CONTROL WALL ALONG TULLAHAN RIVER (STA. 1+000 TO STA. 1+383), VALENZUELA CITY, 2ND LD","Flood Control and Drainage","Completed",17675529.36,0,100,"Metro Manila 3rd DEO","National Capital Region","FRAMECON BUILDERS (22482)","2016-03-23","2017-09-01",2016,"Regular Infra - GAA 2016 MFO-2",14.6921,121.01589,"1381600000","1307500000"]
SHA-256
e0d117267833c395722ea436384759e73c292206f9bcec8d60660acbde8e0fcc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.