Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16OI0070

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16OI0070","CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT UPPER PALIKO CREEK, BRGY. CUPANG, MUNTINLUPA CITY","Flood Control and Drainage","Completed",17689724.01,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","AKN CONSTRUCTION CORPORATION (11845)","2016-08-02","2016-12-29",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,null]
SHA-256
92f187f0894d3ff4e8fe83b7c95aefc606c08e7c6dd0ed4a52c1d3b63ea252d2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.