Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16P00046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16P00046","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BAYUDAN-CHICO RIVER FLOOD-EROSION CONTROL PROJECT","Flood Control and Drainage","Completed",97499969.39,0,100,"Cordillera Administrative Region","Cordillera Administrative Region","FIAT CONSTRUCTION SERVICES (05463)","2016-04-08","2017-04-16",2016,"Regular Infra - GAA 2016 MFO-2",17.006,120.8772,"1404402000","1404400000"]
SHA-256
1fc5224a84bb1e28dc33ec9c06b581dff0c40ffeed20e5e4fc242e02a3a07afd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.