Project 17AB0004
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17AB0004","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE","GAA 2017 MFO-2","Completed",48999790.01,0,100,"Ilocos Norte 2nd DEO","Region I","GACUTAN CONSTRUCTION INC. (FORMERLY: GACUTAN CONSTRUCTION) (10789) / MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT) (6715)","2017-02-24","2017-11-10",2017,"Regular Infra - GAA 2017 MFO-2",17.93487,120.68174,"102814000","102800000"]
SHA-256
17b8481a4d421fcee6b7052f964f820458f46b76e7abaa2b9463bdc83c6d96e6Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.