Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17AD0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17AD0011","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG SEVILLA BRIDGE MNR (DEEPENING OF WATERWAY AND CONSTRUCTION OF  REVETMENT WALL), STA. CRUZ, ILOCOS SUR","Flood Control and Drainage","Completed",10709018.71,0,100,"Ilocos Sur 2nd DEO","Region I","PRECIOUS CONSTRUCTION (32995)","2017-03-30","2017-12-15",2017,"Regular Infra - GAA 2017 MFO-2",17.00609,120.45616,"102924000","102900000"]
SHA-256
8d21af5bd9dfd9260ebd136652a6d82b341e935df2cd6512556ef3dd1cf1a1a6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.