Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17AH0055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17AH0055","REHABILITATION OF RIVERBANK PROTECTION OF DUMOLOC RIVER,CAYANGA SECTION,BUGALLON,PANGASINAN","Flood Control and Drainage","Completed",13965218.24,0,100,"Pangasinan 2nd DEO","Region I","BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) (8292)","2017-03-27","2017-09-10",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"105500000"]
SHA-256
c9e4b6e75d4bf12a26633a6f3d20f8893740db7c294322d1110b5ee9f257e707

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.