Project 17BD0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17BD0026","MF02: CONSTRUCTION OF SAN ISIDRO FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 1+300-STA. 1+446, SAN ISIDRO, IGUIG, CAGAYAN","Flood Control and Drainage","Completed",42606975.82,0,100,"Cagayan 3rd DEO","Region II","DEKM CONSTRUCTION (32409) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2017-02-21","2018-06-30",2017,"Regular Infra - GAA 2017 MFO-2",17.77109,121.70963,"201515000","201500000"]