Project 17BI0034
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-17BI0034",
"title": "REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA",
"sector": [
"Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Flood Control: Maintenance - Dredging, Desilting, River Rechanneling/Excavation Works"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Nueva Vizcaya DEO"
},
"period": {
"startDate": "2018-01-15",
"endDate": "2018-07-15"
},
"budget": {
"amount": {
"amount": 43135998.33,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
121.11334,
16.46056
]
}
}
],
"parties": [
{
"name": "JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES)",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "17BI0034",
"summary": {
"title": "REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA",
"status": "closed",
"contractValue": {
"amount": 43135998.33,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Outside Infra - Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Flood Control: Maintenance - Dredging, Desilting, River Rechanneling/Excavation Works",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "2c2d4019427b9f68c0c9f991a52ae8f6391a181f0c5b6f1457e90fec44d1a2df"
}
}