Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17BI0126

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17BI0126","REHABILITATION/IMPROVEMENT OF BAKIR FLOOD CONTROL STRUCTURES (STA.0+000-STA. 0+507.10), BAGABAG, NUEVA VIZCAYA","Flood Control and Drainage","Completed",18591210.85,0,100,"Nueva Vizcaya DEO","Region II","A.P.B. CONSTRUCTION (17055)","2018-08-30","2019-03-01",2018,"Outside Infra - GAA 2018 NDRRMF",16.64794,121.22648,"205003000","205000000"]
SHA-256
47e08d9a2b2611848575435f478f968e6a783110570bfde2b5b8bb439d4625ee

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.