Project 17CB0067
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CB0067","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND CHANNEL EXCAVATION OF TALISAY RIVER, DIWA-NAGWALING SECTION, STA.0+000 - STA.0+425, PILAR, BATAAN","Flood Control and Drainage","Completed",36890711.13,0,100,"Bataan 2nd DEO","Region III","HORAMABI BUILDERS (24129) / ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)","2017-06-13","2018-01-07",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"300800000"]
SHA-256
8dbb6485f3618e7d9f047edd29c541500984a8ea7481cb33ff7bdbc85260e239Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.