Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CB0074

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CB0074","FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND CHANNEL EXCAVATION OF TALISAY RIVER, CUPANG SECTION, STA.0+000-STA.0+405, BALANGA CITY, BATAAN","Flood Control and Drainage","Completed",39829310.23,0,100,"Bataan 2nd DEO","Region III","HORAMABI BUILDERS (24129) / ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)","2017-06-14","2018-01-09",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"300800000"]
SHA-256
c6a4d989ab9c273859e987d2c231262276405631f7b8e2f98ea8305e91ea01d7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.