Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CB0116

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CB0116","CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM AT CABOG-CABOG ELEMENTARY SCHOOL, BALANGA CITY, BATAAN","Buildings and Facilities","Completed",2482688.59,0,100,"Bataan 2nd DEO","Region III","DE JESUS CONSTRUCTION (11452)","2017-10-31","2018-02-22",2017,"Outside Infra - GAA 2017 DepEd BEFF",null,null,null,"300800000"]
SHA-256
981e9f1bc4824e95b85b768c0519b0c7978042b37edc4a31af9d2260bb0cf950

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.