Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CD0285

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CD0285","CONSTRUCTION OF 4-STOREY, 8-CLASSROOM STA. MARIA NATIONAL HIGH SCHOOL, STA. MARIA, BULACAN","Buildings and Facilities","Completed",19520034.37,0,100,"Bulacan 2nd DEO","Region III","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2017-12-27","2018-08-23",2017,"Outside Infra - GAA 2017 DepEd BEFF",14.81326,120.95174,"301404000","301400000"]
SHA-256
8c7174c8f5398a3a277ea5926fc6034b89fb8562757834d89919dc9767dae19c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.