Project 17CF0057
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CF0057","FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURE AND DRAINAGE SYSTEM PAMPANGA RIVER CONTROL, BRGY. POPOLON, PALAYAN CITY, NUEVA ECIJA","Flood Control and Drainage","Completed",47236015.51,0,100,"Nueva Ecija 2nd DEO","Region III","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / VNKC CONSTRUCTION (12614)","2017-07-10","2017-12-19",2017,"Regular Infra - GAA 2017 LFP",null,null,null,"304900000"]
SHA-256
9b125a9b0f8cc5ec59ca601e539b6d98111867752a4b5da503f546a9db527ba1Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.