Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CF0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CF0059","FLOOD CONTROL STRUCTURES/FACILITIES, REPAIR/REHAB OF STA. ROSA FLOOD CONTROL, STA. ROSA, NUEVA ECIJA","Flood Control and Drainage","Completed",47285087.21,0,100,"Nueva Ecija 2nd DEO","Region III","L.S.D.  CONSTRUCTION & SUPPLIES (8980) / VNKC CONSTRUCTION (12614)","2017-07-10","2017-12-22",2017,"Regular Infra - GAA 2017 LFP",null,null,null,"304900000"]
SHA-256
5e950bb23fdd74a9d9815ed69f005f7e528cbed8c9f2817c2e6331e050b5f123

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.