Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CF0088

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CF0088","CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF DIGMALA RIVER CONTROL, ARIENDO SECTION STA. 4+590.36 - STA. 4+831.36, BONGABON, NUEVA ECIJA","Flood Control and Drainage","Completed",8813974.93,0,100,"Nueva Ecija 2nd DEO","Region III","CCF EARTHMOVING CORP. (36572)","2017-07-19","2017-10-05",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"304900000"]
SHA-256
6ce661d45357b9b7b219dc103d22292fa13a999f707b3eadcaef7980738f6c14

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.