Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CF0146

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CF0146","MFO-2 FLOOD MANAGEMENT SERVICES: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CORONEL RIVER FLOOD CONTROL, STA. 20+272.22- STA. 20+731.22, BARANG","Flood Control and Drainage","Completed",19277563.62,0,100,"Nueva Ecija 2nd DEO","Region III","D.S. PAMINTUAN CONSTRUCTION (31868)","2018-01-09","2018-05-10",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"304900000"]
SHA-256
7c4bb9bc9b2587b55b840d9e36986f6907aa979ccb672be0954871f1d7f14e7e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.