Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CF0170

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CF0170","CONSTRUCTION OF 1 STY - 1UW BUILDING, MACABACLAY NATIONAL HIGH SCHOOL, BONGABON, NUEVA ECIJA","Buildings and Facilities","Completed",3491637.63,0,100,"Nueva Ecija 2nd DEO","Region III","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)","2017-12-01","2018-03-11",2017,"Outside Infra - GAA 2017 DepEd BEFF",null,null,null,"304900000"]
SHA-256
30a15c4858ce7af526befe2b87351c0fb08686b41069b8d9bb7dcd4b61eea1ce

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.