Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CH0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CH0012","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RETAI","Flood Control and Drainage","Completed",11436923.53,0,100,"Pampanga 2nd DEO","Region III","MCB ZAMORA CONSTRUCTION & SUPPLY (32006)","2017-02-17","2017-07-17",2017,"Regular Infra - GAA 2017 MFO-2",14.86037,120.62046,"305422000","305400000"]
SHA-256
bebe39e988799a40ee10476be1a752bc51f32e8f9dc536ecc4e4e8dc847a221c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.