Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CH0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CH0015","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION/REHABILIT","Flood Control and Drainage","Completed",30886377.74,0,100,"Pampanga 2nd DEO","Region III","OMICRON CONSTRUCTION INC.(FORMERLY: OMICRON CONSTRUCTION) (9575)","2017-02-17","2017-07-16",2017,"Regular Infra - GAA 2017 MFO-2",14.9381,120.53479,"305408000","305400000"]
SHA-256
c689c33e2502613bb8bfc33cd0fe64aa28fa510191bfc095c7f32d3b6c98af1a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.