Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CH0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CH0020","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMEN","Flood Control and Drainage","Completed",42412548.02,0,100,"Pampanga 2nd DEO","Region III","ALL EML CONSTRUCTION CORPORATION (FORMERLY: E.M.L. CONSTRUCTION & TRADING) (10151)","2017-02-17","2017-10-14",2017,"Regular Infra - GAA 2017 MFO-2",14.90741,120.59135,"305408000","305400000"]
SHA-256
0728919065c7a18b33f93ad2a056e7203d4a7f1e4ae88371ad22029515e71a44

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.