Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CH0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CH0028","CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/","Flood Control and Drainage","Completed",17557626.01,0,100,"Pampanga 2nd DEO","Region III","J.S. LIM CONSTRUCTION AND TRADING,OPC (FORMERLY:J.S.LIM (12107)","2017-02-17","2017-06-16",2017,"Regular Infra - GAA 2017 MFO-2",14.93682,120.62364,"305422000","305400000"]
SHA-256
87ac3014df41715de001a3b419f32fa735b8c8a3fef17c6b55965c063afb138a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.