Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CH0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CH0030","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMEN","Flood Control and Drainage","Completed",13677253.56,0,100,"Pampanga 2nd DEO","Region III","J.S. LIM CONSTRUCTION AND TRADING,OPC (FORMERLY:J.S.LIM (12107)","2017-02-17","2017-07-16",2017,"Regular Infra - GAA 2017 MFO-2",14.81883,120.61965,"305422000","305400000"]
SHA-256
74ea2bda2eb3f99bc110f6c560f574edf23204154728f739be87c1f96eb5c841

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.