Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CH0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CH0033","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD","Flood Control and Drainage","Completed",27306629.67,0,100,"Pampanga 2nd DEO","Region III","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2017-02-17","2017-08-15",2017,"Regular Infra - GAA 2017 MFO-2",14.93903,120.53583,"305408000","305400000"]
SHA-256
bda3f113400786bf9d54b4b34ddfd922ffa48efe155627c9c9578554ed03a01b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.