Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CJ0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CJ0021","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, BILAD SECTION (PHASE 1), CAMILING, TARLAC 1ST LD","Flood Control and Drainage","Completed",41307156.1,0,100,"Tarlac DEO","Region III","ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. (09036)","2017-02-13","2017-08-06",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"306900000"]
SHA-256
e5c38b8589212ba7eb2680c34ea561bdeb39e77aa0b4fc142c7b3848b3cd07c4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.